Planning · implementation · renovation

Renovation & Refurbishment

From partial renovation to complete interior refurbishment in apartments, villas, offices and commercial spaces, we manage demolition, services, electrical and plumbing work, walls and ceilings, flooring, painting, cladding and fixed furniture under one application plan.

Renovation and interior refurbishment work
One Implementation Plan
A coordinated process from demolition to final installation.
From the existing space to a new arrangement

We do more than refresh the space; we rethink it according to how it needs to be used.

A renovation may involve only renewing surfaces, or it may require a complete reorganisation of electrical and plumbing systems, partition walls, kitchen, bathroom, flooring and fixed furniture. For this reason, we assess the existing structure and the elements that need to change before work begins.

By sequencing interdependent works correctly, we aim to reduce unnecessary repetition and establish material and team coordination from the outset. As the scope becomes clearer, the budget, work programme and application decisions can also progress in a more controlled way.

Existing Condition Analysis
Surfaces, building services, dimensions and renovation requirements are inspected on site.
Team Coordination
Demolition, services and finishing works are managed in the correct application sequence.
Clear Scope of Work
Items to be carried out, retained and replaced are clearly separated before work begins.
Ready-for-Handover Result
The space is prepared for use after final checks, adjustments and cleaning.
Renovation Scopes

Complete renovation, transformation of selected areas or controlled partial refurbishment according to the need.

We define the scope according to the age of the space, existing services, usage plan and elements to be retained. Not every renovation requires stripping the entire property, but changing only visible surfaces is not always sufficient either.

Complete Interior Renovation
01
Comprehensive Transformation

Complete Interior Renovation

From layout changes and building services to floors, surfaces, kitchens, bathrooms and fixed furniture, we renovate the entire space under one work programme.

Kitchen & Bathroom Renovation
02
High-Use Areas

Kitchen & Bathroom Renovation

We coordinate interdependent items such as services, waterproofing, ceramic finishes, worktops, cabinetry, sanitary ware and lighting in the correct application sequence.

Partial Renovation & Modernisation
03
Renovation of Selected Areas

Partial Renovation & Modernisation

We plan limited works such as renewing flooring, paint, ceilings, lighting, doors, selected service points or a single room without unnecessarily affecting the rest of the space.

Renovation Plan

A good renovation begins by establishing the correct sequence before work starts.

Moving on to finishing works without allowing for service requirements, new service points and surface preparation that may emerge after demolition can lead to work having to be repeated. That is why we manage renovation as a layered application plan.

Existing elements to be retained, surfaces to be removed, service interventions and new materials are separated before work begins. This allows teams to progress in an order that prevents one trade from damaging another's work.

Older buildings may contain concealed services, moisture, unevenness or substrate issues that are not visible before demolition. If an unforeseen condition is discovered, the relevant work item should be assessed and the scope updated before application continues.
01
Existing Condition & Measurement
The space, service points, surfaces and fixed elements to be retained are documented.
02
Protection & Demolition
Areas to be retained are protected, and furniture, finishes and surfaces to be removed are dismantled in a controlled manner.
03
Electrical & Plumbing
Sockets, lighting, water, drainage and required service lines are prepared according to the new layout.
04
Wall & Ceiling Preparation
Partitions, render, plaster, repairs, ceiling work and required surface corrections are completed.
05
Flooring & Final Finishes
Ceramic, parquet, cladding, paint and decorative finishes are applied in the correct sequence.
06
Installation & Handover
Furniture, fixtures, lighting and complementary elements are installed and final adjustments are completed.
Pre-Application Planning
The Correct Work Sequence
Concealed works first, visible finishes afterwards.
We do not close surfaces before completing service and infrastructure checks, and we sequence finishing works so later teams do not damage completed work.
Service Scope

We bring all interdependent renovation work items together under one programme.

The exact scope is determined after the site survey according to the condition of the existing structure, areas to be changed, material preferences, technical requirements and existing elements that will remain in use.

Site Survey and Condition Assessment

Dimensions, existing surfaces, service points, elements to be retained and renovation needs are assessed on site.

Demolition and Site Preparation

Existing finishes, kitchens, bathrooms, flooring or required sections are removed in a controlled manner, with protection and waste handling organised.

Electrical and Plumbing

Electrical, lighting, clean-water, drainage and required service modifications are carried out according to the new use.

Wall, Ceiling and Painting Works

Partition walls, render, plaster, plasterboard, suspended ceilings, surface preparation and painting are completed.

Flooring, Ceramic and Cladding

After screed and any required substrate corrections, parquet, ceramic, porcelain and other finishes are installed.

Furniture, Installation and Handover

Kitchen units, cabinetry, sanitary ware, fixtures, lighting and complementary elements are installed and final checks are carried out.

Our Work Process

A planned and controlled renovation process from site survey to final cleaning

We check how each stage relates to the work before and after it, and progress the material, trade and site programme according to the application sequence.

01

Site Survey and Needs Analysis

We inspect the space and identify usage needs, existing issues and the areas that need to change.

02

Scope, Quotation and Schedule

We define the work items, material level, application sequence, estimated duration and quotation scope.

03

Design and Material Decisions

We finalise the required layout, electrical, lighting and fixed-furniture decisions, together with product and sample selections, before work begins.

04

Protection, Demolition and Services

After protection and demolition, we carry out the required electrical, water, drainage, wall and service interventions.

05

Finishing Works and Installation

We complete flooring, ceramic, painting, cladding, ceiling, furniture, fixture and lighting installation in the correct order.

06

Final Inspection and Handover

We check outstanding items, adjustments, surfaces and operating equipment, then hand over the space after final cleaning.

Concealed Works

The quality of a renovation is determined not only by visible surfaces, but also by the services and substrates that will later be concealed.

New paint, ceramic finishes or furniture may look good, but problems can appear later if the plumbing, waterproofing, wall and floor preparation beneath them are not carried out correctly. For this reason, we inspect concealed work before moving on to the next layer.

Electrical wiring, sockets and lighting infrastructure
Clean-water, drainage and plumbing connections
Waterproofing in bathrooms and required wet areas
Wall, corner and surface flatness
Screed, floor levels and preparation beneath finishes
Services above the ceiling and required support details
Dimensions of doors, furniture and fixed elements
Pre-installation service and operational checks
Infrastructure Inspection
Check before closing, solve without breaking later.
Services, waterproofing and substrates are checked before the final finish is applied.
Areas We Renovate

We carry out renovation work in residential and commercial spaces according to different scopes and usage scenarios.

A complete renovation of an empty apartment is not managed with the same site plan as renovating only the kitchen or bathroom in an occupied home. Protection, work sequence and handover method are arranged separately according to how the space is being used.

View Completed Work
Apartments and Residences

Apartments and Residences

Complete renovation, layout changes or modernisation of selected areas.

Villas and Detached Houses

Villas and Detached Houses

Coordinated interior renovation works covering multiple spaces.

Kitchen Renovations

Kitchen Renovations

Plumbing, flooring, wall, worktop, cabinetry, electrical and lighting works.

Bathroom Renovations

Bathroom Renovations

From demolition and waterproofing to ceramic finishes, sanitary ware and fixture installation.

Offices and Commercial Spaces

Offices and Commercial Spaces

Transformation according to layout, lighting, surface and fixed-furniture requirements.

Partial Renovation Works

Partial Renovation Works

Controlled renewal of ceramic finishes, flooring, paint, ceilings or a specific section.

Frequently Asked Questions

Questions About the Renovation and Refurbishment Process

Every space has a different age, infrastructure and amount of work required. The exact scope, duration and material plan are finalised after the site survey.

Do you have another question?

Depending on the scope, the service can include site survey, protection and demolition, electrical and plumbing alterations, wall and ceiling works, flooring and ceramic applications, painting and surface finishes, kitchen and bathroom renovation, fixed furniture, installation, final inspection and cleaning. The exact work items are specified during the survey and quotation stage.

In a complete renovation, several systems and surfaces in the space are renewed together; services, planning, flooring, walls, kitchen, bathroom and fixed furniture can all form part of the same programme. A partial renovation is limited to a specific room, surface or group of works.

It depends on the extent of the proposed changes. If the work includes layout changes, new electrical and lighting points, kitchen work or fixed-furniture production, preparing the necessary measurements and drawings before application makes the process more controlled. Simple surface renewals may not require the same level of design documentation.

In some cases, this is possible for limited and localised work. However, for complete renovations involving extensive demolition, dust, noise, or water and electricity interruptions, it is safer and more efficient for the space to be vacant. The situation is assessed during the site survey according to the work required.

The duration varies according to the size of the space, amount of demolition, service alterations, drying times, custom-made furniture and material delivery dates. Once the scope is defined, an estimated start and handover schedule is shared.

Yes. We can present product alternatives, or you can supply approved materials yourself. However, product specifications and delivery dates should be checked against the application plan to prevent delays or dimensional incompatibilities.

In older buildings, concealed plumbing, electrical lines, moisture, surface defects or floor-level issues may only become visible after demolition. In such a case, the affected area is assessed and any additional work, time and cost are communicated before proceeding.

If the scope allows, they can be protected. Furniture, joinery, flooring or fixed elements to be retained are identified during the site survey and protected appropriately before work begins. However, some works may require the relevant surface to be completely removed for correct application.